Workers At Risk. Doesn't trace the metals in its batteries to the mine, where child and forced labour are documented.
Why this grade
SMA names none of its 464 direct suppliers and publishes no smelter or refiner list. Its Altenso batteries come from China or South Korea, and it doesn't trace their metals to the mine. In its favour, its inverters are made at its own site in Germany.
Until SMA traces the metals in its batteries to the mine, it can't show that the people who dig and refine them are free and fairly paid.
Other inverters brands
No inverters brand we've graded is better than Workers At Risk yet.
See every inverters brand · Ask us to grade a inverters brand
Know something we've missed? Send evidence. Represent SMA? Send a right of reply.
Ask SMA to do better
Brands change when customers ask. Copy this message into SMA's contact form or a post that tags it, or send it by email. Change the words as you like.
Compare SMA with another brand
Why it's graded Workers At Risk
Meets 3 of 6 Good requirements, with 2 red flags.Open why it has this gradeClose why it has this grade
- Holds the grade back: It relies on battery metals it can't trace to the mine. That alone means a poor grade until it takes steps to trace them.
- It isn't Harm On Record, because there's no serious confirmed problem on its record.
- Workers At Risk is still a poor grade: in supply chains like this, workers who can't be seen to be treated fairly are usually underpaid or unprotected.
Good requirements 3 of 6
- Not met: Pays a living wage, or holds a strong fair-pay certificationLiving wage: no evidence
- Met: Respects worker rights
- Not met: Supply chain independently audited or certified, or at least 80% made in countries with strong labour standards
- Met: No child or forced labour findings or links
- Met: Names the factories or farms that make its products, or is fully certified by a scheme that holds and audits that listMakes its products in its own factories
- Not met: Traces the silicon in its panels to the smelter or quartz mine, outside Xinjiang (for batteries and inverters: traces its battery metals to the mine)
Red flags 2
- Red flag: No evidence it pays a living wage
- Red flag: Relies on battery metals it can't trace to the mine
- Red flag: Fails its category's raw-material check (means a poor grade)
Stars it would earn as Good
None yet. Stars only show on Good companies. About stars
Where it's made
Germany. The rest isn't confirmed.Open where it's madeClose where it's made
From SMA's own disclosure: it makes its products in its own factories. Its list covers only part of its range. The rest isn't confirmed, so it is shown as where solar panels and batteries are usually made, and its grade assumes those countries for that part.
| Country | Worker rights | Legal minimum wage | Forced labour risk |
|---|---|---|---|
| Germany | Strong protections | About a living wage | Low |
| ChinaUsual for the industry | No guarantee of rights | Below a living wage | Moderate |
| VietnamUsual for the industry | Systematic violations | Well below a living wage | Moderate |
| MalaysiaUsual for the industry | No guarantee of rights | Below a living wage | Moderate |
| South KoreaUsual for the industry | No guarantee of rights | Close to a living wage | Low |
Evidence
4 things we found and what 3 independent sources say.Open the evidenceClose the evidence
Based on what SMA publishes, with few independent checks. Researched with AI assistance against published rules. Last researched 7 November 2026 · 7 sources · How we check
What we found
- Sells no crystalline-silicon solar panels (batteries, inverters or thin-film panels only)
- Modern slavery statement
- Owns or runs its own production
- Relies on cobalt, lithium, graphite and nickel from mines and refineries linked to child and forced labour in DR Congo, Indonesia and Xinjiang. It hasn't shown any steps to trace the metals in its batteries to the mine, so it gets a poor grade until it does.
Research notes SMA says its string, battery and central inverters are developed and produced by SMA itself at Niestetal near Kassel, Germany; it plans a US string-inverter line with a partner in Tennessee. Its 2023 Australian statement reports 464 direct suppliers in 25 countries, risk audits of 54.5% of group companies, self-assessments by 81.8% of key suppliers and no substantiated supply-chain violations, but names no suppliers and doesn't mention Xinjiang or minerals. It publishes no smelter or refiner list and no origin for its cells or components. No labour abuses were found.
What independent sources say
| Source | Result | Details |
|---|---|---|
| Australian Modern Slavery Register | Statement filed | SMA Solar Technology AG and its subsidiaries, including SMA Australia, lodged a joint modern slavery statement for 2023. View |
| US forced-labour import bans (UFLPA Entity List, CBP Withhold Release Orders) | No import ban | SMA is not on the US forced labour (UFLPA) Entity List (edition of 29 October 2026). View |
| Solar Stewardship Initiative certified sites | Not listed | SMA has no site on the Solar Stewardship Initiative's list of certified sites (checked November 2026). View |
Sources and actions
7 sources, company details, and how to send evidence or a right of reply.Open the sources and company detailsClose the sources and company details
Sources 7
Show all 7 sources
- Solar Stewardship Initiative certified sites · search the archive · SMA not among certified sites
- SMA modern slavery statement 2023 (Australian Modern Slavery Register) · search the archive · Joint statement with SMA Australia; 464 direct suppliers in 25 countries; audits and self-assessments; no substantiated violations; Altenso batteries from China or South Korea
- UFLPA Entity List, 29 October 2026 (Federal Register) · archived copy (the page has since been taken down) · SMA not listed
- SMA opens German factory designed for 60 GW output (TaiyangNews) · search the archive · Gigawatt Factory at Niestetal; planned Tennessee string-inverter production with a partner
- SMA Solar announces plans to cut up to 350 additional jobs (MarketScreener) · search the archive · SMA employs 3,800 people, 2,800 at Niestetal
Published by SMA or its owner
- Made in Germany declaration (SMA) · search the archive · String, storage and central inverters developed and produced by SMA in Niestetal, Germany
- Human rights and environmental due diligence (SMA) · search the archive · Risk analysis, code of conduct for business partners, speak-up line; no audit results or supplier lists
Company details
- Headquarters
- Germany
- Employees
- About 3,800
- Last researched
- 7 November 2026
- Cite this page
- Labour Lens, "Is SMA ethical? Labour rating", https://www.labourlens.net/brand/sma-solar, last researched 7 November 2026, accessed [date].
- Method
- Researched with AI assistance against published rules. How we check · What Workers At Risk means
Something missing or wrong?
Grades are opinions based on the evidence listed here. Send us evidence, or a right of reply if you represent SMA.
Find your next brand
Search any brand or product to see how it's graded.
